Maroochydore on Queensland’s Sunshine Coast is undertaking a large redevelopment of its CBD. One of our clients was involved in the construction of a new bridge as part of a road upgrade, with Class 2 Silt Curtain utilised to create a settlement area and ensure that suspended solids did not escape the work area.
Project Overview
Date: January, 2015
Location: Maroochydore, QLD, Australia
Features Summary
Silt Curtain Length: | 150.0m |
Silt Curtain Depth: | 2.0m with tapered skirt to best fit application |
Silt Curtain Material: | Class 2 Silt Curtain with Non woven 240gsm geotextile, 610gsm PVC and 100mm floats |
Project Summary
- A standard bridge building project as part of the Maroochydore CBD redevelopment
- Two runs of 75m Class 2 Silt Curtain were placed on either side of the bridge to ensure a settlement area