Chatoyer was contracted to design, supply, deliver and install the 4 baffle systems for their Westdale Alliance project.
Project Overview
Date: February 2011
Location: Tamworth, New South Wales, Australia
Features Summary
Baffle length: | 3 x 170m long baffles with 4m skirt & 1 x 120m long baffle |
Materials used: | XR-5 Geomembrane, SS mounting hardware & HDPE anchoring systems |
Floats: | Solid molded closed cell polyethylene foam floats |
Ballast: | Lead ballast |
Project Summary
- Chatoyer were contracted to design, supply, deliver and install the 4 Westdale Alliance floating baffles
- A design was put together to accommodate the variation in normal operating level and maximum operating levels during maintenance periods
- Installation of the baffle systems was completed in one week