Protection of Stormwater During Construction

Silt Wardens were installed to provide protection of stormwater pits during construction. Silt migration was identified as an environmental risk while widening a motorway. The Silt Warden was placed in the existing stormwater pits within the median strip to prevent silt from escaping into the stormwater system.

Heavy Duty Turbidity Curtain Performs Well in Rough Conditions

Heavy Duty Silt Curtain installed in rough seas at Lyttelton Port

To contain debris and sediment associated with the reclamation of Lyttelton Port, a heavy duty turbidity curtain was installed. The area is subject to extreme weather conditions with winds exceeding 40 knots, currents of 8 knots and ocean swells up to 6m.

Celebrating 2 year install at Barangaroo

The heavy duty permanent silt curtain install at Barangaroo around, a Sydney landmark, has been installed and managed by our project partners Polaris Marine for over 2 years. Chatoyer is proud of this engineered silt curtain, and as these photos show, it continues to perform very successfully. This area is a high frequency ferry area […]

Bridge Construction Silt Curtain

Chatoyer silt curtain Sunshine Coast river

During the construction of a new bridge as part of a road upgrade, Class 2 Silt Curtain was utilised to create a settlement area and ensure that suspended solids did not escape the work area.

Completion of boom for Fire & Rescue NSW

Chatoyer has completed another tranche of Floating Fence and Containment Boom for the Fire & Rescue New South Wales. Each boom is custom made and fabricated in 10m lengths with custom carry bags to make for easy storage and handling. The commencement of this contract was one of the initial reasons that Chatoyer started manufacturing […]

Waste Removal Exercise – Sydney Harbour

To complete a task of unblocking a storm water culvert for NSW Government on the shores of Lavender Bay, Sydney Harbour. Chatoyer was contracted by Polaris Marine to manufacture suitable floating environmental protection measures in the case of an oil spill or migration of sediment during the operation. The storm water entry is near a […]

New Case Study – Hanging Odour Curtain

odour control curtain indoor view

Chatoyer has recently uploaded a case study covering the design, fabrication and installation of a series of hanging odour curtains to provide odour control for a major waste recovery facility. Please click on the link below to see more. Odour Control System Case Study

Odour Control Hanging Curtains

odour control hanging curtain with windows

A major Waste Recycling Facility was having difficulties with odour migrating to surround neighbours and environs. Following a site visit by Chatoyer Environmental, a series of hanging curtains were manufactured to provide odour control. Two panels were designed for the front of the facility with a clear PVC window in the centre of each panel for […]

Environmental Health Check

environmental compliance inspection by polluted creek at industrial plant

Having 25 years experience supplying the environmental compliance industry, Chatoyer is pleased to offer a complimentary Environmental Health Check. This document is a useful checklist for you to discover a range of environmental risks that may be present on your work site. From spill risks through to storm water protection, this Environmental Health Check will […]

Fined for allowing sediment pollution

Chatoyer silt curtain Install Queensland tidal

As reported today in The Press (New Zealand), two businesses were fined $52,000 in August 2014 for allowing dirty run off from a housing development enter Duvauchelle Bay in Canterbury, New Zealand. Click here to read more Don’t get fined. Use the products and recommendations available to prevent pollution by sediment. See what Chatoyer has to […]